The EC has decided to transfer €1.47 billion to Bulgaria under the Recovery Plan
The European Commission announced today that it is granting Bulgaria €1.465 billion from the third payment under the National Recovery and Resilience Plan (NRRP)
The European Commission announced today that it is granting Bulgaria €1.465 billion from the third payment under the National Recovery and Resilience Plan (NRRP)
The National Construction Control Directorate (DNCK) issued a permit for the use of the Luda Yana Dam for drinking water. This marks the end of the 10-year construction of the facility
One opportunity for the development of the second and third pensions we receive from pension insurance companies is the introduction of a multi-fund system in Bulgaria
The National Railway Infrastructure Company (NRIC) has taken a step towards completing the Bulgarian section of Trans-European Railway Corridor 8
Lending activity in Bulgaria remains high, which in the short term is positive for banks' profitability, but in the long term creates a risk to their balance sheets
The Bulgarian economy has achieved its highest level of transparency in 15 years, but the labor market is showing worrying signs of a return to gray practices