RIA quietly signed a 5 yr contract with Kapsch for the toll system

The new contract was signed without public announcement before Christmas and the annexes to the contract are missing

RIA quietly signed a 5 yr contract with Kapsch for the toll system

© ECONOMIC.BG / Krasimir Svrakov

~ 4 min read
Автор: Gloria Hristova Gloria Hristova