NEC changes strategy for replacing two hydroelectric units at the Chaira pumped storage power plant

Repairs to hydroelectric unit 3 have been completed and it is due to be put into operation in April

NEC changes strategy for replacing two hydroelectric units at the Chaira pumped storage power plant
~ 3 min read
Автор: Georgi Zhelyazkov Georgi Zhelyazkov